Hwy 65 Virtual Engagement
Highway 65 PEL Study
Welcome to the Highway 65 PEL Study virtual public meeting!
We are excited to share our three corridor options with you! Please click through this 14-slide presentation to review background information, explore study recommendations and learn about our next steps. The entire session should take around 30 minutes to complete.
Learn more general information about Planning & Environmental Linkages (PEL) studies.

COVID-19 update

The Department of Transportation has postponed all in-person meeting to prevent the spread of COVID-19. Public engagement is still a priority and we appreciate you joining us online to learn more about this study.
How to navigate

Click the arrows on the right and left of your screen to go forward or backward. Use the navigation bar on the left of your screen to revisit any part of the meeting.
Provide comments

Click the comment button at the top right of your screen to provide a comment to our project team.
Content Overview
This virtual engagement session includes...

Background
Learn a little about why we are doing this study and what work we’ve already completed
Study Recommendations
Explore the recommended options for Highway 65 and tell us what you think
Next Steps
Learn about the next steps to complete this study and how future projects will be determined
Have questions, need more information or want to talk with the team?
A live virtual event is being planned for mid-September. Visit the project website to sign up for the project email list and be notified when it’s scheduled. Submit your questions ahead of time through the comment features on this site.
About the Project
Study overview
The Minnesota Department of Transportation in partnership with Anoka County and the cities of Blaine, Ham Lake and Spring Lake Park are studying the Highway 65 corridor between Bunker Lake Boulevard and County Road 10/Mounds View Boulevard.

Click the image above to enlarge.
Study purpose
The purpose of the study is to identify cost-effective solutions to address the following issues on Highway 65 in this area:
![]() |
Primary Transportation ProblemVehicle Safety |
![]() |
Primary Transportation ProblemVehicle Congestion |
![]() |
Secondary Transportation ProblemWalking and Biking |
Other considerations
Previous Study on Highway 65
Before we jump to our findings, let’s look back and recap where we’ve been.
2005 study
MnDOT completed a multi-year study along the Highway 65 corridor in 2005.

Click the images shown here to enlarge.
Today's study
In August, 2018 MnDOT and partners started a Planning & Environmental Linkages (PEL) study of this corridor. A PEL study identifies a flexible corridor vision that addresses transportation, environmental and community goals. It also identifies a roadmap for implementing projects over time to achieve the corridor vision.

Engaging the Community
Our team has been engaging with the Blaine, Ham Lake and Spring Lake Park communities to gather input that helped our project team identify recommendations for this stretch of Highway 65. The different ways we connected with the community are highlighted below.
Community Feedback
Listening to the community was an important part of this project and the feedback we received, both in-person and online, helped us get to where we are today. Let’s review what we heard!
Problems and considerations
During the first round of engagement, we asked community members if they agreed with the problems and considerations we identified. The majority of respondents agreed that the top two problems in this area are:
Vehicle Safety
Vehicle Congestion
This input guided how we evaluated potential solutions moving forward.
Exploring new solutions
After we agreed on the primary problems and consideration, we moved to the next step in the process, which was to look at different solutions to help address these corridor issues. We knew that traditional solutions, like major bridges and freeways, were not necessarily the most cost-effective solutions, so we explored new tools, like innovative intersection designs. We presented four of the most promising innovative intersection designs to the public during this time:
Displaced left turn

Bowtie

Median u-turn (at grade)

Median u-turn (grade-separated)

Click the images shown here to enlarge.
Of the four designs, the majority of respondents liked the Grade Separated Median U-Turn design the best. This input helped us understand which potential solutions the community may support moving forward.
Where We Are Now
Project schedule
After we identified several potential options to improve this stretch of Highway 65, we moved on to the next step – evaluating the options to find the best solutions.

Click the images shown here to enlarge.
Corridor Evaluation
Narrowing down options
We used the input from the community to help us identify many options for this stretch of Highway 65. We evaluated these options through three levels of screening and narrowed them down to the three that best address the community’s primary problems—vehicle safety and vehicle congestion.

Identifying the best solutions
All three options will make traveling along or across Highway 65 safer and faster in this section of Highway 65.

Even though all the options will improve Highway 65, the options look different and have different potential impacts and tradeoffs. Continue through this virtual engagement to explore more.
View the Options Evaluation Matrix to see the full analysis.
Study Recommendations
Based on the results of the evaluation, we are recommending three corridor options move forward as potential solutions for Highway 65. Continue through this virtual engagement to explore each option in detail.
Corridor sections
We split this stretch of Highway 65 into three sections for the purpose of our evaluation. In the following slides, we’ll walk you through the options section by section.

Click the images shown here to enlarge.
Takeaways

These are very preliminary designs
Additional planning and community input will occur (and likely change the designs) before any projects move forward
All options improve the primary problems
You identified vehicle safety and vehicle congestion as the primary problems for this stretch of Highway 65
We can mix and match
The options for one section can be combined with any of the options for other sections
Section 1 Recommendations
Section overview
Section 1 includes the stretch from approximately 81st Avenue NE in Spring Lake Park to approximately 95th Avenue in Blaine.
The section is highlighted on the map shown here, and additional information about the evaluation process and key features is included below. Click the green click "Option 1, Option 2, and Option 3" banners for more details and information.
Evaluation summary
| Criteria | Option 1 Freeway | Option 2 Hybrid Freeway | Option 3 Hybrid Freeway + Interchange |
|---|---|---|---|
| Is vehicle safety improved? | |||
| Are vehicles able travel along and across Highway 65 in less time? | |||
| Is safety and comfort for people walking and bicycling improved? | |||
| Level of impacts to existing landowners and businesses | |||
| Cost to build | |||
| Do the benefits outweigh the costs? | |||
| Level of travel impacts during construction |
Tell us what you think...
Option 1 – Freeway
Explore the map
- Use your mouse cursor or finger to pan left and right around the map below.
- Hover or click on each orange marker for more detailed information about how the features of this option would impact traffic, access, and interchanges in the surrounding area.
- On a phone or tablet? Rotate your screen horizontally for a better interactive map experience. Or, skip the map and explore the "Key features" content further down the page.
Diamond Interchange:
County Road 10 and Highway 65 would connect via a standard diamond interchange with signals on Hwy 65.
People walking and bicycling would also be able to more easily and safely cross County Road 10 via a new trail on both sides of the highway.
Bridge at 87th Ave:
Access to and from Highway 65 at 85th Avenue NE and 89th Avenue NE would be limited to right turns only. However, a new bridge at 85th Avenue NE would provide an East/West link between neighborhoods for vehicles and people walking and bicycling. You would use the new bridge to cross Highway 65 to get on and off.
While the total distance you travel to turn left would be a little longer, the time it takes would actually be less.
Audio description:
Median U-turn:
Traveling between Highway 65 and Highway 10 would look a lot different than today, particularly if you're making a left turn.
While the total distance you travel to turn left would be a little longer, the time it takes would actually be less.
People walking and bicycling would also be able to move more easily and safety along Highway 65 via a new trail on both sides.
Audio description:
Key features
Click each green banner below to learn more.
Diamond Interchange at County Road 10
Example of a diamond interchange at 35W & Lexington Avenue in Blaine, MN
Bridge at 87th Avenue
Learn more about how you’d travel in this area
Audio description:
Median U-Turn at Highway 10
Learn more about how you’d travel in this area
Audio description:
Option 2 – Hybrid Freeway
Explore the map
- Use your mouse cursor or finger to pan left and right around the map below.
- Hover or click on each orange marker for more detailed information about how the features of this option would impact traffic, access, and interchanges in the surrounding area.
- On a phone or tablet? Rotate your screen horizontally for a better interactive map experience. Or, skip the map and explore the "Key features" content further down the page.
Signalized Rotary Intersection:
The existing cloverleaf interchange at County Road 10 would be converted to a signalized rotary intersection with one-way roads. People walking and bicycling would also be able to more easily and safely cross County Road 10 via a new trail on both sides of the highway.
Audio description:
Bridge at 87th Ave:
Access to and from Highway 65 at 85th Avenue NE and 89th Avenue NE would be limited to right turns only. However, a new bridge at 85th Avenue NE would provide an East/West link between neighborhoods for vehicles and people walking and bicycling. You would use the new bridge to cross Highway 65 to get on and off.
While the total distance you travel to turn left would be a little longer, the time it takes would actually be less.
Audio description:
Median U-turn:
Traveling between Highway 65 and Highway 10 would look a lot different than today, particularly if you're making a left turn. People walking and bicycling would also be able to move more easily and safety along Highway 65 via a new trail on both sides.
Audio description:
Key features
Click each green banner below to learn more.
Signalized County Road 10 Intersection
Example of the proposed signalized rotary intersection type in South Padre Island, TX
Audio description:
Bridge at 87th Avenue
Learn more about how you’d travel in this area
Audio description:
Median U-Turn and Displaced Left Turn at Highway 10
Conceptual Displaced Left Turn intersection design
Learn more about how you’d travel in this area
Audio description:
Option 3 – Hybrid Freeway + Interchange
Explore the map
- Use your mouse cursor or finger to pan left and right around the map below.
- Hover or click on each orange marker for more detailed information about how the features of this option would impact traffic, access, and interchanges in the surrounding area.
- On a phone or tablet? Rotate your screen horizontally for a better interactive map experience. Or, skip the map and explore the "Key features" content further down the page.
Standard Diamond Interchange:
County Road 10 and Highway 65 would connect via a standard diamond interchange with signals on Hwy 65.
People walking and bicycling would also be able to more easily and safely cross County Road 10 via a new trail on both sides of the highway.
Bridge at 87th Ave:
Access to and from Highway 65 at 85th Avenue NE and 89th Avenue NE would be limited to right turns only. However, a new bridge at 85th Avenue NE would provide an East/West link between neighborhoods for vehicles and people walking and bicycling. You would use the new bridge to cross Highway 65 to get on and off.
While the total distance you travel to turn left would be a little longer, the time it takes would actually be less.
Audio description:
Median U-turn:
Traveling between Highway 65 and Highway 10 would look a lot different than today, particularly if you're making a left turn. People walking and bicycling would also be able to move more easily and safety along Highway 65 via a new trail on both sides.
Audio description:
Key features
Click each green banner below to learn more.
Diamond Interchange at County Road 10
Example of a diamond interchange at 35W & Lexington Avenue in Blaine, MN
Bridge at 87th Avenue
Learn more about how you’d travel in this area
Audio description:
Median U-Turn and Displaced Left Turn at Highway 10
Conceptual Displaced Left Turn intersection design
Learn more about how you’d travel in this area
Audio description:
Section 2 Recommendations
Section Overview
Section 2 includes the stretch of Highway 65 from approximately 95th Ave NE in Blaine, MN to approximately 117th Ave NE/Cloud Drive NE in Blaine, MN.
The section is highlighted on the map shown here, and additional information about the evaluation process and key features is included below. Click the green click "Option 1, Option 2, and Option 3" banners for more details and information.
Evaluation Summary
| Criteria | Option 1 Freeway | Option 2 Hybrid Freeway | Option 3 Hybrid Freeway + Interchange |
|---|---|---|---|
| Is vehicle safety improved? | |||
| Are vehicles able travel along and across Highway 65 in less time? | |||
| Is safety and comfort for people walking and bicycling improved? | |||
| Level of impacts to existing landowners and businesses | |||
| Level of impact to wetlands | |||
| Cost to build | |||
| Do the benefits outweigh the costs? | |||
| Level of travel impacts during construction |
Tell us what you think...
Option 1 - Freeway
Explore the map
- Use your mouse cursor or finger to pan left and right around the map below.
- Hover or click on each orange marker for more detailed information about how the features of this option would impact traffic, access, and interchanges in the surrounding area.
- On a phone or tablet? Rotate your screen horizontally for a better interactive map experience. Or, skip the map and explore the "Key features" content further down the page.
Roundabout exit and entrance ramps:
On and off ramps from Highway 65 would connect to the local system via a roundabout. People walking and bicycling would be able to easily and safely cross Highway 65 via a new bridge with separated trails at 99th Avenue NE.
Exit and entrance ramps near 103rd Ave:
A new two-way frontage road, with a separated trail, would connect 99th Avenue NE to 109th Avenue NE on the west side of Highway 65.
Staggered on and off ramps connecting to the new and existing frontage road system would provide access to Highway 65 in this area.
Right turns only at 105th Ave:
Access to and from northbound Highway 65 at 105th Avenue NE would be limited to right turns only.
People walking and bicycling would be able to easily and safely cross Highway 65 via a new tunnel at 105th Avenue NE.
Audio description:
Diverging Diamond Interchange:
A new interchange will be built at 109th Avenue NE. The additional land needed to build an interchange will impact nearby properties.
People walking and bicycling would be able to easily and safely cross Highway 65 via a new bridge with separated trails at 109th Avenue NE.
Tight Urban Interchange:
A new interchange will be built at 117th Avenue NE. The additional land needed to build an interchange will impact nearby properties.
People walking and bicycling would be able to easily and safely cross Highway 65 via a new bridge with separated trails at 117th Avenue NE.
Key features
Click each green banner below to learn more.
Roundabout exit and entrance ramps for northbound Highway 65 at 99th Avenue
Example of a similar roundabout at Highway 36 & Hilton Trail in Pine Springs, MN
Exit and entrance ramps off of new western Highway 65 frontage road near 103rd Avenue
Example exit and entrance ramps off of a frontage at Highway 62 near 34th Avenue in Minneapolis, MN
Right turns only at 105th Avenue and other circulation changes in the area
Learn more about how you’d travel in this area
Audio description:
Diverging diamond interchange at 109th Avenue to move traffic while reducing property impacts
Example of a diverging diamond interchange at Highway 101 & 141st Avenue in Rogers, MN
Tight urban interchange at 117th Avenue
Example of a tight urban interchange at Highway 62 and Xerxes Avenue in Minneapolis, MN
Option 2 - Hybrid Freeway
Explore the map
- Use your mouse cursor or finger to pan left and right around the map below.
- Hover or click on each orange marker for more detailed information about how the features of this option would impact traffic, access, and interchanges in the surrounding area.
- On a phone or tablet? Rotate your screen horizontally for a better interactive map experience. Or, skip the map and explore the "Key features" content further down the page.
Grade Separate Median U-Turn:
Frontage roads and separated trails would be added on either side of Highway 65 from 117th Avenue to 93rd Lane. Other features of this area would include right-in right-out intersections, U-turns underneath Highway 65 bridges, and ramps connecting Highway 65 to the new frontage roads.
An example of similar grade Separate Median U-Turn intersection in Houston, TX is shown here.
Roundabout Intersection:
A roundabout would be built near 101st Avenue allowing traffic to cross underneath Highway 65. The frontage road on the west side of Highway 65 between 99th Avenue and 103rd Way will be a two-way street.
Audio description:
Separated Trail Crossings:
Separated trail crossings under Hwy 65 would be provided at 97th Ave, 105th Ave, 107th Ave, 109th Ave, 113th Ave and 117th Ave.
Key features
Click each green banner below to learn more.
Grade Separated Median U-Turns near 97th Avenue, 107th Avenue and 113th Avenue
Conceptual Grade Separated Median U-Turn intersection design
Example of similar grade Separate Median U-Turn intersection in Houston, TX
Roundabout at 101st Avenue and other circulation changes
Learn more about how you’d travel in this area
Audio description:
Separated trail crossings at 97th Avenue, 105th Avenue, 107th Avenue, 109th Avenue, 113th Avenue and 117th Avenue
Locations of separated crossings for people walking and bicycling
Option 3 - Hybrid Freeway + Interchange
Explore the map
- Use your mouse cursor or finger to pan left and right around the map below.
- Hover or click on each orange marker for more detailed information about how the features of this option would impact traffic, access, and interchanges in the surrounding area.
- On a phone or tablet? Rotate your screen horizontally for a better interactive map experience. Or, skip the map and explore the "Key features" content further down the page.
Grade Separate Median U-Turn:
Frontage roads and separated trails would be added on either side of Highway 65 from 117th Avenue to 93rd Lane. Other features of this area would include right-in right-out intersections, U-turns underneath Highway 65 bridges, and ramps connecting Highway 65 to the new frontage roads.
An example of similar grade Separate Median U-Turn intersection in Houston, TX is shown here.
Separated Trail Crossings:
Separated trail crossings under Hwy 65 would be provided at 97th Ave, 105th Ave, 107th Ave, 109th Ave, 113th Ave and 117th Ave.
Grade Separated Median U-Turn Intersection:
A new interchange at 109th would improve traffic operations, but also require more right-of-way impacts.
Audio description:
Key features
Click each green banner below to learn more.
Grade Separated Median U-Turns near 97th Avenue, 107th Avenue and 113th Avenue
Conceptual Grade Separated Median U-Turn intersection design
Example of similar grade Separate Median U-Turn intersection in Houston, TX
Separated trail crossings at 97th Avenue, 105th Avenue, 107th Avenue, 109th Avenue, 113th Avenue and 117th Avenue
Locations of separated crossings for people walking and bicycling
Interchange at 109th Avenue
Learn more about how you’d travel in this area
Audio description:
Section 3 Recommendations
Section Overview
Section 3 includes the stretch of Highway 65 from approximately 117th Ave NE/Cloud Drive NE in Blaine, MN to approximately 143rd Avenue NE in Ham Lake, MN.
The section is highlighted on the map shown here, and additional information about the evaluation process and key features is included below. Click the green click "Option 1, Option 2, and Option 3" banners for more details and information.
Evaluation Summary
| Criteria | Option 1 Freeway | Option 2 Hybrid Freeway | Option 3 Hybrid Freeway + Interchange |
|---|---|---|---|
| Is vehicle safety improved? | |||
| Are vehicles able travel along and across Highway 65 in less time? | |||
| Is safety and comfort for people walking and bicycling improved? | |||
| Level of impacts to existing landowners and businesses | |||
| Cost to build | |||
| Do the benefits outweigh the costs? | |||
| Level of travel impacts during construction |
Tell us what you think...
Option 1 - Freeway
Explore the map
- Use your mouse cursor or finger to pan left and right around the map below.
- Hover or click on each orange marker for more detailed information about how the features of this option would impact traffic, access, and interchanges in the surrounding area.
- On a phone or tablet? Rotate your screen horizontally for a better interactive map experience. Or, skip the map and explore the "Key features" content further down the page.
New Frontage Road:
A new frontage road with separated trail would be added between 131st Avenue NE and 133rd Avenue NE on the east side of Highway 65. The new addition would fill a gap in the existing frontage road system on the east side of Highway 65. People walking and bicycling would be able to easily and safely cross Highway 65 via a new tunnel at 133rd Avenue NE.
Tight Urban Interchange:
A new interchange will be built at Bunker Lake Boulevard NE. The additional land needed to build an interchange will impact nearby properties. People walking and bicycling would be able to easily and safely cross Highway 65 via a new bridge with separated trails at Bunker Lake Boulevard NE.
Key features
Click each green banner below to learn more.
New frontage road on the east side of Highway 65 near 133rd Avenue
Existing frontage road along Highway 65 near 129th Avenue in Blaine, MN
Tight urban interchange at Bunker Lake Boulevard
Example of a tight urban interchange at Highway 62 and Xerxes Avenue in Minneapolis, MN
Option 2 - Hybrid Freeway
Explore the map
- Use your mouse cursor or finger to pan left and right around the map below.
- Hover or click on each orange marker for more detailed information about how the features of this option would impact traffic, access, and interchanges in the surrounding area.
- On a phone or tablet? Rotate your screen horizontally for a better interactive map experience. Or, skip the map and explore the "Key features" content further down the page.
New Frontage Road:
A new frontage road with separated trail would be added between 131st Avenue NE and 133rd Avenue NE on the east side of Highway 65. The new addition would fill a gap in the existing frontage road system on the east side of Highway 65. People walking and bicycling would be able to easily and safely cross Highway 65 via a new tunnel at 133rd Avenue NE.
An existing frontage road along Highway 65 near 129th Avenue in Blaine, MN is shown here.
At Grade Median U-Turn Intersection:
The intersection at Bunker Lake Blvd would be converted to a reduced conflict U-turn (RCUT) intersection. People walking and bicycling along Bunker Lake Blvd would be able to more easily and safely cross Highway 65 via a separated trail crossing.
Key features
Click each green banner below to learn more.
New frontage road on the east side of Highway 65 near 133rd Avenue
Existing frontage road along Highway 65 near 129th Avenue in Blaine, MN
Reduced Conflict Intersection (At Grade Median U-Turns) at Bunker Lake Boulevard
Conceptual At Grade Median U-Turn intersection design
Option 3 - Hybrid Freeway + Interchange
Explore the map
- Use your mouse cursor or finger to pan left and right around the map below.
- Hover or click on each orange marker for more detailed information about how the features of this option would impact traffic, access, and interchanges in the surrounding area.
- On a phone or tablet? Rotate your screen horizontally for a better interactive map experience. Or, skip the map and explore the "Key features" content further down the page.
New Frontage Road:
A new frontage road with separated trail would be added between 131st Avenue NE and 133rd Avenue NE on the east side of Highway 65. The new addition would fill a gap in the existing frontage road system on the east side of Highway 65. People walking and bicycling would be able to easily and safely cross Highway 65 via a new tunnel at 133rd Avenue NE.
Grade Separated Median U-Turn Intersection:
Traveling around the Bunker Lake Blvd/Highway 65 intersection would look very different if this option is selected. A frontage road with separated trail would be added on either side of Hwy 65. On the west side of Highway 65, the frontage road would be a two-way street between a new roundabout and 136th Ave, and a one-way street in the southbound direction from 136th Ave to the north.

A bridge would be added north of the intersection allowing u-turns to happen underneath Highway 65. A roundabout would be added to the southwest of the intersection moving traffic safely from the frontage road to the highway. A pedestrian and bicycle tunnel would also be added under Highway 65 at Bunker Lake Blvd.
Audio description:
Key features
Click each green banner below to learn more.
New frontage road on the east side of Highway 65 near 113rd Avenue
Existing frontage road along Highway 65 near 129th Avenue in Blaine, MN
Conceptual Grade Separated Median U-Turn intersection design
Conceptual Grade Separated Median U-Turn intersection design
Example of similar grade Separate Median U-Turn intersection in Houston, TX
Learn more about how you’d travel in this area
Audio description:
What's Next?
Project schedule
Our next step will be to complete this study by summarizing all the technical information, community input and recommendations in a final report. The report will be released by MnDOT in late 2020. This virtual public meeting is the last engagement opportunity for this study.

Click the images shown here to enlarge.
After this study is complete...


Future design
Future projects will be designed within the corridor vision identified in this study.
Funding availability
Individual projects will be designed and implemented over time as funding is available.
Project processes
As they are developed, each specific project will go through additional planning, analysis and community engagement. Changes may be made to the design during these processes.
Stay Connected
Thank you for your interest in the Highway 65 Study! We encourage and value your input throughout the process.
Sign Up For project updates
For more information about the project and to sign up to receive email updates, please visit:
www.dot.state.mn.us/metro/projects/hwy65hamlake-slp
Call the project hotline
Leave us a voicemail message comment or ask a question on our Highway 65 Study project hotline:
763.312.5008
Follow MnDOT on social media
Facebook: www.facebook.com/mndot
Twitter: www.twitter.com/mndot
YouTube: www.youtube.com/c/mndotvideos
MnDOT social media hub: www.dot.state.mn.us/socialmedia
Contact MnDOT
To submit a general comment or question for the project team, click on the comment button in the top right corner of your screen.
Questions for the MnDOT project team?
Melissa Barnes, P.E., MnDOT North Area Manager
melissa.barnes@state.mn.us | 651.234.7718
Kent Barnard, Communications and Engagement
kent.barnard@state.mn.us | 651.253.2803
Want to talk with the team?
A live virtual event is being planned for mid-September. Visit the project website to sign up for the project email list and be notified when it’s scheduled. Submit your questions ahead of time through the comment features on this site.
Share this information!
Please pass along the link to this virtual open house to family, friends and coworkers who use this stretch of Hwy 65 regularly. Use the links below to share this website through Facebook, Twitter, an email, or an SMS text message.
Share on Facebook Share on Facebook
Share on Twitter Share on Twitter
Share by Email Share by Email
Share by Text Message Share by SMS Text Message